The TramFret project – Setting up the experiment of transporting freight by tramway – Progress made by the end of 2011 “...from utopia to the project...”

The TramFret project – Progress made by the end of 2011

The project to set up a freight tramway in Île-de-France has taken a more operational turn of events, mainly by one freight line being tested for a month. This has convinced the project team that the idea is well founded: there was no disruption to passenger traffic or road traffic and it was well received by tramway users and transport and merchandise professionals. The year 2012 will be spent moving from this first trial on to “the real thing”, with the decision to begin the operational phase being taken at the end of the year and the aim to have it up and running in 2014.

Contents (in French):

1. Rappel du contexte

  • Objectif
  • Pilotage du projet TramFret
  • Planning
  • Identité visuelle et propriété industrielle

2. L’expérimentation à travers la marche à blanc

3. Bilan de la marche à blanc

  • Suivi des indicateurs RATP : impact sur les TC
  • Impact sur la circulation
  • Enquête auprès des usagers
  • Communication médiatique et TramFret

4. Conclusion

  • Retour d’expérience
  • Suites prévues en 2012 et au-delà

5. Annexe : Exploitation T3

6. Annexe : Enquêtes usagers

  • Tableaux des résultats (effectifs et pourcentages)
  • Les questionnaires de l’enquête

7. Annexe : Comptes rendus des comités de suivis

  • Compte rendu du COPIL TramFret #3 du  8 février 2011
  • Compte rendu du COPIL TramFret #4 du 14 septembre 2011

8. Annexe : Où parle-t-on de TramFret ?

  • Presse spécialisée
  • Presse grand public
  • Sites web institutionnels
  • Reportages vidéo
  • Web français
  • Web étranger

Resources

Documents to download

  • The TramFret project – Setting up the experiment of transporting freight by tramway – Progress made by the end of 2011 “...from utopia to the project...”

    Format : pdf, 16.76 MB
    Download